Big Cola


Date:  2014

Location:  6th of October

Our Solution:

  • Supply & install Main distributors – Switch gear – ABB
  • Supply & install power transformer – ABB
  • Supply & install distribution medium voltage panel – ABB
  • Supply & install distribution low voltage panels – ABB
  • Supply & install ALL cables – EL-SEWEDY
  • Supply & install LECTO busbar