Lake West


Date:  2023

Location:  Shikh Zayed

Our Solution:

Supply and install the main power station for Lake West Compound which consist of:
  • Distribution Transformer 1000 KVA -oil
  • Ring main unit 3+1+M
  • Distribution Low Voltage Panel.
Supply and install Medium and Low voltage Cables networks.
Project Duration: 2023 – 2024