Rabaa El Adwya Hospital


Date:  2022

Location:  Nasr city

Our Solution:

Supply and install the main Power Station of the Hospital which consist of:
  • Distribution transformer 1000 KVA – QTY 2.
  • Ring main unit 3+1+M – 2M-QTY 2.
  • Distribution low voltage panel.
  • Low voltage panel 2 out of 3, power factor correction panel, ATS panel.
  • And what follows it of cables, terminations, busbar and Earthing system.