Our Solution:

Supply and install the main power station which consist of:
  • Medium Voltage Distributer 12 cells
  • 7NO Distribution transformer .
  • Ring main unit 4+0+M .
  • Distribution low voltage panels.
  • And what follows it of cables, terminations, busbar and Earthing system
 
Supply and install medium and low voltage cables networks.
Supply and install High Mast , Decorative , street lighting poles.
Project Duration: 2017-2018